Phased migration from on-premises or between cloud providers, with rollback plans and no big-bang cutover.

Phased
No big-bang cutover
Reversible
Rollback at each wave
12-30 wk
Typical programme
Overview

About cloud migration

Migration horror stories almost all share one feature: a single cutover weekend with no way back. Handled in phases with rollback at each stage, migration is routine engineering work.

Assessment before any movement

We inventory applications, dependencies, data volumes, and compliance constraints first. That inventory determines the sequence — which systems move first, which move together, and which should not move at all.

Lift-and-shift versus re-architecture

Moving a workload unchanged is faster and lower risk, but carries existing inefficiencies into an environment where they cost more. Re-architecting captures cloud economics but takes longer. We usually recommend a mix: lift-and-shift to exit the datacentre, then optimise selectively once running.

Data migration and parallel running

Data is the difficult part, especially with large volumes or strict downtime limits. We use replication and parallel running so the new environment is proven under real load before traffic moves, and rollback remains available throughout.

Capabilities

What the engagement includes

Migration assessment

Application, dependency, data, and compliance inventory.

Phased migration plan

Sequenced waves with rollback criteria per wave.

Data migration & replication

Validated transfer with reconciliation and parallel running.

Post-migration optimisation

Right-sizing and re-architecture once workloads are stable.

Outcomes

What you get

The measurable results this service is accountable for.

  • Phased migration with rollback at every stage
  • Dependencies mapped before anything moves
  • Parallel running proves the target under real load
  • Sensible mix of lift-and-shift and re-architecture
  • Post-migration optimisation once stable
How we work

A process without surprises

Clear checkpoints at every stage, so you always know what is shipping and when.

1Discovery & scoping2Architecture & design3Build & review4Launch & support
  1. 1

    Discovery & scoping

    We map requirements, users, integrations, and constraints, then agree scope and a fixed quote before work starts.

  2. 2

    Architecture & design

    Technical architecture and user flows are agreed and prototyped before implementation begins.

  3. 3

    Build & review

    Development in reviewable increments, with a staging environment you can see and comment on throughout.

  4. 4

    Launch & support

    Performance and security checks, documented handover, deployment, and an agreed support window after go-live.

Scope

What is included at each tier

Engagements scale with your stage. Every tier includes everything below it.

What is included at each engagement tier
What's includedStarterGrowthEnterprise
Migration assessment & inventoryIncludedIncludedIncluded
Phased migration planIncludedIncludedIncluded
Migration executionNot includedIncludedIncluded
Data migration & validationNot includedIncludedIncluded
Post-migration optimisationNot includedNot includedIncluded
Industries

Sectors we work in

E-Commerce & Retail
SaaS & Technology
Healthcare
Real Estate
Finance & FinTech
Education
Travel & Hospitality
Professional Services
Why iDream

We migrate in phases with rollback available at every stage, which is what separates routine migrations from the disaster stories.

FAQ

Common questions

How much downtime is required?
Usually very little. With replication and parallel running, cutover is a traffic switch measured in minutes. Systems with very large datasets or strict consistency requirements need more planning, which the assessment identifies.
Should we lift-and-shift or re-architect?
Commonly both, in sequence. Lift-and-shift to exit the datacentre and stop the clock on hardware, then re-architect the workloads where cloud-native patterns genuinely pay. Re-architecting everything upfront extends timelines considerably.