Skip to content
iDream Technologys

Cloud Migration Services

Phased migration from on-premises or between cloud providers, with rollback plans and no big-bang cutover.

  • Phased migration with rollback at every stage
  • Dependencies mapped before anything moves
  • Parallel running proves the target under real load
  • Sensible mix of lift-and-shift and re-architecture
Data centre server racks with network cabling
Tools & platforms
  • AWS
  • Azure
  • Google Cloud
  • Terraform
  • Docker
Phased
No big-bang cutover
Reversible
Rollback at each wave
12-30 wk
Typical programme
Overview

What cloud migration covers

Migration horror stories almost all share one feature: a single cutover weekend with no way back. Handled in phases with rollback at each stage, migration is routine engineering work.

Assessment before any movement

We inventory applications, dependencies, data volumes, and compliance constraints first. That inventory determines the sequence — which systems move first, which move together, and which should not move at all.

Lift-and-shift versus re-architecture

Moving a workload unchanged is faster and lower risk, but carries existing inefficiencies into an environment where they cost more. Re-architecting captures cloud economics but takes longer. We usually recommend a mix: lift-and-shift to exit the datacentre, then optimise selectively once running.

Data migration and parallel running

Data is the difficult part, especially with large volumes or strict downtime limits. We use replication and parallel running so the new environment is proven under real load before traffic moves, and rollback remains available throughout.

Capabilities

What we deliver

Key features and capabilities of our cloud migration work.

Migration assessment

Application, dependency, data, and compliance inventory.

Phased migration plan

Sequenced waves with rollback criteria per wave.

Data migration & replication

Validated transfer with reconciliation and parallel running.

Post-migration optimisation

Right-sizing and re-architecture once workloads are stable.

Process

How the engagement runs

A clear sequence with a visible output at every step — so you always know where the project stands.

  1. 01

    Discovery & scoping

    We map requirements, users, integrations, and constraints, then agree scope and a fixed quote before work starts.

  2. 02

    Architecture & design

    Technical architecture and user flows are agreed and prototyped before implementation begins.

  3. 03

    Build & review

    Development in reviewable increments, with a staging environment you can see and comment on throughout.

  4. 04

    Launch & support

    Performance and security checks, documented handover, deployment, and an agreed support window after go-live.

Technologies & tools

Chosen per project for fit, maintainability, and your existing stack.

  • AWS
  • Azure
  • Google Cloud
  • Terraform
  • Docker

Industry applications

Sectors where we most often apply this service.

Engagement tiers

What's included at each level

Every engagement is scoped to your needs; these tiers show how scope typically grows.

What is included at each engagement tier
What's includedStarterGrowthEnterprise
Migration assessment & inventoryIncludedIncludedIncluded
Phased migration planIncludedIncludedIncluded
Migration executionNot includedIncludedIncluded
Data migration & validationNot includedIncludedIncluded
Post-migration optimisationNot includedNot includedIncluded
FAQ

Cloud Migration: common questions

How much downtime is required?

Usually very little. With replication and parallel running, cutover is a traffic switch measured in minutes. Systems with very large datasets or strict consistency requirements need more planning, which the assessment identifies.

Should we lift-and-shift or re-architect?

Commonly both, in sequence. Lift-and-shift to exit the datacentre and stop the clock on hardware, then re-architect the workloads where cloud-native patterns genuinely pay. Re-architecting everything upfront extends timelines considerably.

Ready to talk about cloud migration?

Tell us what you need. We reply within one business day with questions or a call slot — and a fixed, written proposal after.